A Buyer's Checklist for a GE Lighting LED Upgrade (And What I Wish Someone Had Told Me About Metal Halide, Smart Lighting, and Hidden Fees)

Who this checklist is for

I'm the office administrator for a 300-person professional services company. I manage all lighting and facilities ordering—roughly $120,000 annually across nine vendors. I report to both operations and finance. I took over purchasing in 2021, and lighting is still the category that humbles me. I process 60-80 orders a year for different departments, and lighting is the one where I still ask for help.

This isn't a lighting engineer's guide. I'm not one. This is for the person who gets asked to 'look into LED lighting' and needs a process that won't blow up the budget or the schedule.

People still search for 'ge-lighting' as one word, and the inventory sheets from our distributor say 'current lighting GE' because Current Lighting operates the GE Lighting brand. Don't let that confuse you. What matters is choosing the right fixture, the right driver, and the right controls.

Use this checklist when you're comparing GE Lighting / Current Lighting products, when you have old metal halide high-bays or fluorescent under-cabinet lights, or when you need to justify a lighting LED upgrade to someone who signs checks.

There are six steps. Step 4 is the one I wish I had learned earlier. (note to self: I really should have written this down before my first retrofit.)

Step 1: Inventory every fixture before you call a vendor

The first upgrade I helped plan almost failed at the fixture count. I trusted a 'quick list' someone gave me and ordered 40 troffers for a floor that actually had 46. (ugh)

Before you call a vendor, walk the building and record:

  • Fixture location, mounting type, ceiling height, and grid type
  • Lamp type: fluorescent tube, metal halide, LED, or CFL
  • Wattage and voltage from the label, even if you have to remove a diffuser
  • Whether the fixture has a ballast and what type it is
  • Existing controls: switch, dimmer, occupancy sensor, daylight sensor

Take photos of the labels. I know it feels like extra work, but it saves you from ordering the wrong driver. And if you have a GE Lighting metal halide light, the difference between 250W and 400W changes the whole retrofit plan.

Step 2: Decide between a retrofit lamp, a retrofit kit, and a full fixture

Start by knowing what you're shopping for. When people search for 'lighting LED,' they usually mean one of three things:

Retrofit lamp. This can be an LED corn lamp that screws into a metal halide socket. It's often the cheapest option, but it needs a compatible socket and sometimes a ballast bypass. Don't assume plug-and-play.

Retrofit kit. This replaces the driver, LED board, and heatsink while keeping the existing housing. It can work well for under-cabinet lights and recessed downlights, but the kit must be listed for your housing.

Full fixture replacement. If the old GE fixture is rusted, has failing wiring, or doesn't work with LED drivers, replace the whole thing. We chose full fixtures for our warehouse because the 400W metal halide housings were older than some of our newest employees.

The upside of the retrofit lamp was about $1,200 in savings. The risk was that a low-cost lamp wouldn't have the right thermal clearance for an old metal halide housing. I kept asking myself: is $1,200 worth potentially paying an electrician twice? We went with retrofit kits for the office and full fixtures for the warehouse. The current GE / Current Lighting catalog includes all three options (as of January 2025, at least), but the right answer depends on your building.

Step 3: Verify controls and smart lighting compatibility before you order

This is where I wanted to save money and almost didn't. We had a few GE Cync / Zigbee under-cabinet lights and a wired dimmer system in the conference rooms. I assumed an LED fixture would work with both. It didn't.

Write down what you actually need:

  • Simple on/off
  • 0-10V dimming
  • Smart lighting app or Zigbee hub (GE Cync uses Zigbee for many products)
  • Occupancy sensing or daylight harvesting

If you're working with a smart strip, put the 'can I cut it' question on the table before someone hands the electrician a pair of scissors. The rules depend on the manufacturer. In general, flexible LED strips can only be cut at marked cut lines. Every product I've installed has had copper pads and a scissors icon. For example, if someone asks me 'can I cut Monster Smart Lighting?' I say: only at the copper pads and scissors icon. The Cync strips I've installed follow the same rule. If you cut through the middle of the LED package, you'll kill the circuit. That's not the kind of problem a warranty covers.

Step 4: Ask what is NOT included in the price

I've learned to ask 'what's NOT included' before 'what's the price.'

It sounds obvious, but most lighting quotes I see are line items for fixtures and little else. I do not mean the vendor is being dishonest. I mean the information isn't in front of you until you ask.

Here are the hidden costs that have appeared on my invoices:

  • Freight and liftgate for pallet deliveries
  • Shipping minimums from the distributor
  • Disposal of old fluorescent tubes or metal halide lamps (regulated waste in many states)
  • Ballast removal and wiring labor
  • New mounting hardware for a different fixture footprint
  • Permit and inspection fees
  • Programming and commissioning for smart controls

The vendor who lists everything upfront—even if the total looks higher—usually costs less in the end. That's why I keep going back to the distributor who puts 'freight included' on the quote.

Step 5: Get rebate and warranty paperwork in writing before you order

This step is the one I nearly skipped. Our first quote looked good and I wanted to say yes quickly. (finally, a simple project!) It wasn't simple.

Before you place an order, check whether the LED fixtures qualify for utility rebates. Many utilities require the product to be on the DesignLights Consortium (DLC) qualified products list or meet ENERGY STAR criteria. Search the DLC list at designlights.org and the ENERGY STAR product finder at energystar.gov.

Ask the vendor to put the rebate amount and the submission process in writing. Rebate money is not a discount on the invoice; it's a separate payment after installation. If you don't submit the paperwork on time, you miss it.

This is also the time to collect spec sheets and warranty terms. GE / Current Lighting has a limited warranty for most fixtures, but 'limited' usually means you need the original invoice, model number, and sometimes a photo of the label. Look for a UL or ETL mark, too. In the US, most commercial fixtures are tested to UL 1598, and LED components are tested to UL 8750.

Step 6: Plan the installation and inspect after the electrician leaves

Find a licensed electrician before you finalize the product selection, not after. In our 2024 vendor consolidation project, the electrician we wanted was booked out 14 weeks. We had to reschedule an entire lighting upgrade. It taught me to check labor capacity before committing to a date.

On installation day:

  • Walk the first few fixtures while the electrician is still there
  • Confirm dimmers work and smart controls connect to the hub or app
  • Check for flicker at the lowest dimming level
  • Ask the electrician to leave any removed ballasts and lamps for disposal if your state requires it

Keep one spare fixture and one spare driver for each common model. I once saved $80 by not ordering a spare driver from the original quote. Six months later, a driver failed and I paid $260 to rush-replace it. The spare-driver lesson was expensive enough that I now put it in every project.

Common mistakes and one weird question

Don't treat a metal halide lamp replacement like changing a light bulb

If you have a GE Lighting metal halide light, you can't just screw in any LED lamp and walk away. You need to match base type, size, voltage, and thermal clearance. You also need to decide whether to bypass the ballast. If the old ballast fails after installation, the new LED lamp can act strange. Ask the electrician to put the ballast bypass method in writing.

Can I cut Monster Smart Lighting to fit my cabinet?

Only at the marked cut lines. I can't speak for every Monster product, but the standard rule for flexible strips is to cut at the copper pads and scissors icon. Cut there, and the rest of the strip can still connect. Cut anywhere else and you risk a short circuit. The Cync strips I've installed follow the same rule. Turn power off, measure twice, and cut at the scissors icon.

Make it a 'spotlight career' moment

I'm not going to pretend lighting procurement is glamorous. But a successful LED upgrade is visible. The warehouse is brighter, the utility bill drops, and people stop complaining about flickering restroom lights. If you're an admin buyer who wants a quiet way to show you can manage a project, this is one. It's a small career spotlight, but it's real.

This was accurate as of January 2025. Lighting products and rebates change fast, so verify current part numbers, certifications, and utility programs before you sign anything. If you take one thing from this checklist, make it step 4: ask what's not included.